Simulation on the Transparency of Electrons and Ion Back Flow for a Time Projection Chamber based on Staggered Multiple THGEMs

16 Feb 2021  ·  Mengzhi Wu, Qian Liu, Ping Li, Shi Chen, Binlong Wang, Wenhan Shen, Shiping Chen, Yangheng Zheng, Yigang Xie, Jin Li ·

The IBF and the transparent rate of electrons are two essential indicators of TPC, which affect the energy resolution and counting rate respectively. In this paper, we propose several novel strategies of staggered multi-THGEM to suppress IBF, where the geometry of the first layer THGEM will be optimized to increase the electron transparent rate. By Garfield++ simulation, the electron transparency rate can be more than 90% of single THGEM with a optimized large hole. By simulating these configurations of triple and quadruple THGEM structures, we conclude that the IBF can be reduced to 0.2% level in an optimized configuration denoted as "ACBA". This strategy for staggered THGEM could have potential applications in future TPC projects.

PDF Abstract
No code implementations yet. Submit your code now

Categories


Instrumentation and Detectors High Energy Physics - Experiment